I wanted to follow up on the recent opening of the Bid 097-JJ02 Hydrogen Peroxide cleaning chemical. Because the bid specifies that the product has to be submitted to FSPMA for testing and approval with in 7 days of the bid opening. We need to know which products need to be submitted, so I was needing to know when the result tabulation be available, so that the process can be completed to meet bid specs. |
Answer |
: |
The bid is still under The Cone of Silence and cannot be discussed. It may be some time before the tab sheet evaluations are completed. This contract may be awarded at the September or October Board meeting. The Cone of Silence is lifted approximately 10 days before the Board meeting when the Notice of Intended Action is posted on our web site. Copies of the bid submittals from all vendors may be viewed at the Procurement office in room 352 of the School Board Administration building. Only the chemical products themselves need to be submitted for testing for approval within 7 days. Product that has been previously approved by the FSPMA does not have to be resubmitted. All dispensers and ancillary material samples do not need to be submitted at this time. A request for such materials will be issued at a future dated if required. |
Date Posted |
: |
7/10/2009 2:43:29 PM |
Attachment |
: |
|