|
Answer |
: |
A. The lifts will be installed over flat floor concrete in old and new shops. In some cases, in-ground lifts will be removed and the space will be filled with a mixture of gravel and concrete. This expense is absorbed by M-DCPS. The vendor , who is awarded the contract, will be required to cut the floor, install the P.V.C. as part of their installation. |